Medway Maritime Hospital
Client: Medway NHS Foundation Trust
Main Contractor: Integrated Health Projects
Architect: Architecture Initiative
Project Overview
Medway Maritime Hospital required a new Emergency Department which has been one of the biggest redevelopment projects that the Trust has undertaken in over a decade, creating an outstanding facility for their clinicians and care for patients.
Blade Flooring were contracted to carry out the supply and installation of Polyflor vinyl in a delicate environment where the works were being installed adjacent to a live ward. There was also a requirement to connect the new Emergency Department to the existing Clinical Decisions Unit where we installed a structural movement joint to link the buildings together.
A successful project for Blade from start to finish and a thrilled main contractor and client.
![](https://bladeflooring-com.stackstaging.com/wp-content/uploads/2018/10/Dark-Blue-Blade-Icon.png)
We offer a free consultation
Get in touch now to book your free consultation with one of our expert team
![Acclaim Acclaim](https://bladeflooring-com.stackstaging.com/wp-content/uploads/2018/11/Acclaim.png)
![SSIP Logo SSIP Logo](https://bladeflooring-com.stackstaging.com/wp-content/uploads/2018/11/SSIP-Logo.png)
![download download](https://bladeflooring.com/wp-content/uploads/2018/11/download.png)